Weider WESY86303 User Manual

Page 18

Advertising
background image

18

44.

Locate the remaining preassembled pair of
Pulley Plates (31) and 3 1/2” Pulleys (82).

Route the High Cable (85) under the indicated
3 1/2” Pulley (82). The end of the Pulley
Plates (31) with two holes should be down-
ward. Refer to the inset drawing.

Be sure

that the Cable is between the Cable Trap
(80) and the Pulley, and that the Cable Trap
is positioned to hold the Cable in place.

Tighten the 3/8” x 2” Bolt (50) and the 3/8”
Nylon Locknut (not shown).

45. Wrap the High Cable (85) around a 3 1/2”

Pulley (82). Attach the Pulley to the Top
Frame (2) with a 3/8” x 2” Bolt (50) and a 3/8”
Nylon Locknut (42).

The Cable must be

routed from the direction shown.

46. Attach the High Cable (85) to a Small “U”

Bracket (32) with a 1/4” Nylon Locknut (44)
and a 1/4” Washer (37).

Do not completely

tighten the Nylon Locknut. It should be
threaded onto the end of the Cable only a
couple of turns, as shown in the inset
drawing.

Attach the Small “U” Bracket (32) to the indi-
cated Weight Tube (25) with a 5/16” x 1 3/4”
Bolt (68) and a 5/16” Nylon Locknut (40).

47. Lay the Low Cable (86) over a 3 1/2” Pulley

(82). Attach the Pulley and both Pulley Covers
(94) to the Ab Upright (1) with the 3/8” x 4”
Bolt (95), two 3/8” Washers (38), and a 3/8”
Nylon Locknut (42).

Do not overtighten the

Nylon Locknut; the Pulley should turn eas-
ily. Make sure that the Cable is between
the Pulley and the post, and that the Pulley
Covers are turned so the wide tabs are on
the indicated side.

47

44

45

46

C

A

B

L

E

A

S

S

E

M

B

L

Y

85

85

80

50

31

42

Post

1

86

Wide tabs

must be on

this side

38

38

95

94

82

End with two

holes should

be down

50

82

2

42

32

68

85

40

37

44

25

85

44

32

37

82

85

Advertising