Weider XP 800 WESY75742 User Manual

Page 10

Advertising
background image

10

14. Attach the Leg Lever (56) to the Leg (5) with a

Leg Station Pin (60). Slide a Cotter Pin (113) onto

the Leg Station Pin.

14

56

60

113

5

11. Insert the Resistance Bar (9) between the

Crossbar Guides (15), and center it on the

Crossbar Block (not shown).

Press a Pulley Bracket (10) onto the Resistance

Bar (9). Screw a 3/8” x 38mm Tension Screw

(114) into the Pulley Bracket a couple of turns.

Make sure the hexagonal hole in the Screw is

on the outside of the Bracket.

Attach a Tether (70) to the Pulley Bracket (10) at

the upper hole, with an M10 x 64mm Button Bolt

(80), an M10 Thick Washer (54), and an M10 Nylon

Locknut (103).

Repeat on the other side of the Resistance

Bar (9). Then, tighten the lower M10 x 152mm

Bolt (86) used in step 10.

12. Hold a Large Pulley (14) inside the Upper Cable

(121). Attach the Pulley to a Pulley Bracket (10)

with an M12 x 58mm Button Bolt (87) and an M12

Nylon Locknut (13). Make sure that the Cable is

routed as shown in the CABLE DIAGRAM on

page 18.

13. Hold a Large Pulley (14) inside the Upper Cable

(121). Attach the Pulley to the other Pulley

Bracket (10) with an M12 x 58mm Button Bolt

(87) and an M12 Nylon Locknut (13). Make sure

that the Cable is routed as shown in the

CABLE DIAGRAM on page 18.

Tighten the two 3/8” x 38mm Tension Screws

(114) an equal number of turns.

11

12

15

70

103

114

114

80

9

10

10

14

121

13

87

13

10

14

121

13

87

54

Advertising