Weider WEBE38890 User Manual

Page 7

Advertising
background image

7

3.

Attach the Frame (2) to the Crossbar (3) with two M8
x 55mm Bolts (27) and two M8 Nylon Locknuts (33).

Tighten the Nylon Locknuts (33) and the Bolts
(23) used in steps 1 to 3.

4.

Attach a Dip Handle (24) to one of the Weight Rests
(19) with an M8 x 60mm Bolt (37), two M8 Washers
(20), an 11mm x 10.5mm Spacer (38), and an M8
Nylon Locknut (33). Slide a Handgrip (12) onto the
Dip Handle and press a 25.4mm Round Inner Cap
(17) into the Dip Handle.

Attach the other Dip Handle (24) to the other Weight
Rest (19) in the same way.

Attach the Right Barbell Hook (28) to one of the
Weight Rests (19) with an M8 Washer (20) and an
M8 Nylon Locknut (33) as shown. The Barbell Hook
must be oriented as shown.
Attach the Left Barbell
Hook (30) to the other Weight Rest (19) in the same
way. Do not tighten the Nylon Locknuts; the
Barbell Hooks must turn easily.

6.

Tap a 38mm Square Inner Cap (15) into each end of
the Leg Lever (4).

Tap a 25.4mm Round Inner Cap (17) into each end of
the weight tube.

4

6

33

27

2

27

3

5.

Using a rubber mallet, tap a 50mm Square Bushing
(18) onto the upper end of each Upright (1, 16).

Slide the Weight Rest (19) with the Left Barbell Hook
(30) into the Left Upright (16). Align one of the adjust-
ment holes in the Weight Rest with the adjustment
hole in the Left Upright. Tighten the Large Threaded
Knob (32) into the Left Upright.

Attach the other Weight Rest (19) to the Right Upright
(1) in the same manner.

5

18

32

1

19

18

32

16

19

30

15

15

17

Weight Tube

17

4

3

19

30

28

38

24

24

20

33

37

20

17

19

12

33

20

Advertising