Weider WESY78734 User Manual

Page 9

Advertising
background image

9

10

15

Metal

Cover

Groove

2

17

121

8

9

14

68

13

81

2

13

90

11

81

121

14

68

2

18

18

16

70

86

86

10. Attach a Small Guide Spacer (18), a Large Guide

Spacer (17), and the two Crossbar Guides (15) to
the Upright (2) with an M10 x 152mm Bolt (86).

Pull the Upper Cable (121) up between the
Crossbar Guides (15). Press the metal cover on
the cable into the groove in the Crossbar Block
(16). Attach a Small Guide Spacer (18), the
Crossbar Block, the two Crossbar Guides (15), an
M10 Thick Washer (54), and the two Tethers (70)
to the Upright (2) with another M10 x 152mm Bolt
(86).

Do not tighten the Bolt yet.

9.

Pull the Upper Cable (121), which is attached
inside of the Mech Frame (not shown), up
between the Upright (2) and the Pulley Plate (68).

Attach another Large Pulley (14) to the Upright (2)
and the Pulley Plate (68) with an M12 x 62mm
Button Bolt (81) and an M12 Nylon Locknut (13).
Make sure that the Upper Cable (121) is
between the two Pulleys.

Hold the 38mm Spacer (90) inside the loop of the
Upper Cable (121), and between the Upright (2)
and the Pulley Plate (68). Attach the Spacer with
an M10 x 58mm Button Screw (11).

Make sure

the ends of the Cable do not wrap around
each other below the Spacer and the Large
Pulleys (14) used in steps 8 and 9 (see the
CABLE DIAGRAM on page 19).

Tighten the M12 Nylon Locknuts (13) used in
steps 8 and 9.

54

8.

Attach a Large Pulley (14) and the Pulley Plate
(68) to the Upright (2) with an M12 x 62mm
Button Bolt (81) and an M12 Nylon Locknut (13).
Do not tighten the Locknut yet.

Advertising