Installation – Zephyr WHIRLWIND AK9800 User Manual

Page 13

Advertising
background image

INSTALLATION

11

STEP 7

STEP 9

(also refer notes on pg. 16)

STEP 11

STEP 8

STEP 10

STEP 12

(also refer notes pg. 16)

1. Lift hood to bottom of cabinet

1. Support hood to place, fasten both rear with screws
and washers provided.

1. Fasten front of hood. Level all sides and adjust
accordingly.**

1. Drill out cabinet base through electrical box with
3/4" boring bit.

1. Pull electrical supply wire through drill out or use
#14 grounded wire for receptacles (not supplied)

1. Connect both wires (blk) on hood to either power
supply (blk or wht). Ground green wire.**

Advertising
This manual is related to the following products: