Assembly, Assembly instructions – Yazoo/Kees Z9 Commercial Collection System Z9A User Manual

Page 7

Advertising
background image

7

Unpacking Instructions

1. Wear gloves and eye protection. Remove

wood pieces.

2. Cut straps around carton and remove top.

NOTE: Watch for nails and wood splinters.

3. Slide carton sleeve out of bottom tray and lift

over Z9.

Assembly Instructions

Frame Assembly

Upper
Frame

Lower

ASSEMBLY

Frame

Tools Required:
1. 3/4" wrench
2. Ratchet
3. 3/4" socket

1. Position the Lower Frame inside the Upper

Frame.

2. Align holes corresponding to desired position

of frame.

3. Secure with eight (8) 1/2” x 1-1/4” hex bolts

and eight (8) 1/2” nylon lock nuts.

Advertising