Set up 6. assemblage 26 – Zenoah TR2000 User Manual

Page 26

Advertising
background image

English

Français

6. Set up

6. Assemblage

26

■ INSTALLING HANDLE
• Mount the handle to the shaft tube and

clamp it at a location that is comfortable
to you. (SE1)

■ INSTALLING DEBRIS GUARD
• Put the debris guard on the gear box,

attach it with the screws and hardware
provided. (SE2)

■ INSTALLING CUTTING HEAD (SE3)
1. While locking the gear shaft by inserting

the supplied tool into the upper holder
on the gear box, loosen and remove the
nut (left-handed).

2. Fit the line head assembly to the gear

shaft over the holders. Hand-tighten it
securely.

■ MISE EN PLACE DE LA POIGNEE
• Monter la poignée sur le bras de

l'appareil et la positionner pour avoir
une prise confortable et sûre (SE1).

■ MISE EN PLACE DU CACHE ANTI-

PROJECTION

• Mettre en place le cache anti-projection

sur le carter du renvoi d’angle et le fixer
à l’aide de vis avec la machine (SE2).

■ INSTALLATION DE LA TETE DE

COUPE (SE3)

1. Tout en bloquant l’arbre d’entraînement

à l’aide de la tige fournie avec la
machine en la plaçant dans le carter,
desserrer et retirer le boulon (pas à
gauche).

2. La vis de la lame dépasse des

supports. Serrez-la à fond
manuellement.

SE1

SE2

SE3

Advertising