Installation – preparing electrical and ducting – Zephyr AK11005 User Manual
Page 12
                                    Advertising
                                    
                                        
                                    
                                
                                 
1. Remove filters
2. Remove cover from junction box to 
gain access to electrical wiring.
3. If using a cable lock, pry open the 
desired electrical knockout either on 
top or back of hood. Feed the wires 
through the cable lock. Some local 
codes require the use of a cable lock, 
check your local codes.
4. If using hood in air recirculating 
mode skip steps 4 and 5.
Pry open desired 3-1/4” x 10” ducting 
knock-out either on top or back of 
hood.
5. Secure 3-1/4” x 10” starting collar 
with damper to the duct opening using 
(10) M4x8 screws. 
Installation –
Preparing Electrical and Ducting
10
www.zephyronline.com
                                    Advertising