Prestige 3000 with ppdm – 3Com Powerware Uninterruptible Power System Prestige Series User Manual

Page 10

Advertising
background image

Introduction

4

Powerware

®

Prestige Series Installation and Operator’s Manual for IBM Applications (3000 VA) Uncontrolled Copy

1. See “Load Requirements” on page 2 for assistance in

determining the total load requirements for your UPS. Round
this number up to the next Load (VA) entry in the following
table, “Prestige 3000 with PPDM,” and enter the number in
Figure 3.

2. In Figure 3, enter the number of battery cabinets that you

have installed. Find the intersection point of the appropriate
Load (VA) and number of battery cabinets in the following
table, “Prestige 3000 with PPDM.” Enter this number in
Figure 3, Total Battery Time Minutes.

If changes take place in your installation, such as different load
parameters or changes to battery cabinet configuration, take time to
reevaluate your approximate battery time availability.

NOTE For detailed information regarding calculation of 9910 UPS battery capacity and
run time for your load, reference: “AS/400 Physical Planning,” SA41-5109, “AS/400
Advanced Series Backup and Recovery - Advanced,” SC41-4305 (see Chapter 10), or
“AS/400e series Backup and Recovery,” SC41-5304 (see Chapter 37).

Prestige 3000 with PPDM

Load (VA)

Load (W)

Approximate Battery Time (in Minutes)

Load (VA)

Load (W)

1 Cabinet

2 Cabinets

3 Cabinets

600

420

36.8

88

146

800

533

27.6

66

110

1200

800

18.4

44

73

1600

1067

13.7

33

54

2000

1333

10.7

26

42

2500

1667

8.3

20

33

3000

2000

6.5

16

27

NOTE For AS/400 usage, see “Base Equipment” on page 69.

Advertising