Installation commissioning, Commissioning, Maintenance – STIEBEL ELTRON SBP E с 01.10.2012 User Manual

Page 13: 4 installation versions, 1 commissioning, 2 decommissioning

Advertising
background image

EN

GL

ISH

www.stiebel-eltron.com

SBP E | SBP E SOL | SBP E cool |

13

InStaLLatIOn

commissioning

6.4 installation versions

6.4.1 installing the immersion heater
The immersion heater is used for electric booster heating.

- With the SBP 200 | 400 the immersion heater can be mounted

on the r.h. or l.h. side.

- One or two immersion heaters can be mounted with the

SBP 700.

f

f Remove the cap from the connector.

f

f Undo the vent plug with an SW 32 socket spanner.

sBP e | sBP e cool

26

�0

3�

01

�0

22

8

sBP 700 e | sBP 700 e sol

26

�0

3�

01

�0

22

7

7. commissioning

7.1 commissioning

Commissioning must only be carried out by a heating contractor.

f

f Fill and vent the appliance.

f

f Check the functions of the accessories in accordance with the

operating and installation instructions supplied with them.

f

f Check the function of the on-site safety valve.

7.2 decommissioning

If the heating system is not in operation and the installation

location is not protected against frost, drain the appliance and

connected system. This is relevant where there is a risk of frost.

8. maintenance

No special maintenance is required for the appliance. A regular

visual check is sufficient.