Chapter 2: control testing, Why run control tests, About the control solution – Accu-Chek Active User Manual

Page 19

Advertising
background image

17

Chapter 2: Control Testing

Why Run Control Tests

Control tests ensure that both the meter and the test strips are working properly and giving reliable results.
You should run a control test when:

•

The meter is new

•

You open a new box of test strips

•

You leave the cap off of the test strip container

•

You want to check the performance of the meter
and test strips

•

You drop the meter

•

Your test results don’t agree with how you feel

•

You want to make sure you’re performing tests
correctly

About the Control Solution

•

Make sure you use only ACCU-CHEK Active
control solution.

•

When you first open the bottle, write the date on
the label – the control solution is good for three
months from that date or until the expiration
date on the bottle, whichever comes first.

•

Never use control solution that has expired.

•

Always close the control solution bottle tightly.

•

Store at room temperature, between 36-86°F
(2-30°C).

Advertising