Connection of the supply and sample lines, Figure 12 connection of supply and sample lines – M&C TechGroup SP2006-H280_DIL Operator's manual User Manual

Page 18

Advertising
background image

18

Gas sampling and gas conditioning technology

2-1.1.7.2-ME

14.1

CONNECTION OF THE SUPPLY AND SAMPLE LINES

All pneumatic lines have to be inserted through the CES cable entry, size 5, with an operative range of
36

– 70mm. It is located in the bottom of the FRP-housing. After insertion and connection of all lines

the CES cable entry can be shrinked by an air heater.

N O T E !

Increases of pressure due to use of long sample gas lines at the outlet may have a
great influence on the measuring result. For this reason, we recommend the fol-
lowing nominal widths and lengths for the sample lines in dependence on the type
of injector:

Injector type I:

i

1/4” max. 50m

i

3/8” max. 150m

Injector type II:

i

8mm max. 15m

i

10mm max. 40m

i

12mm max. 80m


The connections for the supply and sample lines are as follows:

Connection

Dimension

Testgas In

Tube 1/4”

Dilution gas In

Tube 1/4”

Low pressure manometer

Tub

e 1/4”

Sample gas Out (diluted)

Tube 3/8”

Bypass gas In

Tube 1/4”

Bypass gas Out (diluted)

Tube 1/4”

Sample gas Out (undiluted)

Tube 1/4”

Blow back In

Tube 3/8”
















Figure 12

Connection of supply and sample lines

Low pressure

manometer

Sample OUT diluted

Sample OUT

not diluted

Test gas IN

Blow back IN

Dilution gas IN

Bypass gas IN

Advertising