Starting, Figure 4, Electrical connection e.g. sp30-h2 with pt100 – M&C TechGroup SP35-H... Operator's manual User Manual
Page 12
Advertising

12
Gas sampling and gas conditioning technology
2-1.9.6ME
Figure 4
Electrical connection e.g. SP30-H2 with PT100
For executions with thermocouple the temperature sensor is also connected to terminals 7 and 8.
13
STARTING
W A R N I N G !
Before starting up check whether the mains power supply
voltage corresponds with the information stated on the
nameplate.
W A R N I N G !
Start up only the built-in heated probe tube because otherwise
there is a risk of burning !
The following step-by-step procedure is recommended :
Check temperature set value at external controller.
Switch on mains power supply.
The heated sample tubes are ready for operation after 2 hours heat-up time.
Advertising