Starting, Figure 3 – M&C TechGroup SP34-H2 Operator's manual User Manual

Page 9

Advertising
background image

9

Gas sampling and gas conditioning technology

2-2.2MD


Figure 3

Pin assignment for electrical connection of SP34-H2 and SP34-H1.1



12

STARTING

Prior to starting the device, the system and process-specific safety measures must be observed. For
the media to be supplied, the relevant safety requirements and measures must be taken into account.

W A R N I N G !



Before starting up check whether the mains power supply
voltage corresponds with the information stated on the
nameplate.

W A R N I N G !



Start up only the built-in heated probe tube because otherwise
there is a risk of burning !

The following step-by-step procedure is recommended :

Check temperature set value at external controller. Thereto remove lid of the connection box.

Switch on mains power supply.

The heated sample tubes are ready for operation after 2 hours heat-up time.











Temperature sensor

Advertising