Figure 10, Electrical connection for dil-1/h – M&C TechGroup DIL-1_(H) Operator's manual User Manual
Page 21

21
Gas sampling and gas conditioning technology
2-1.1.7.6-ME
N O T E !
For the erection of power installations with nominal voltages of up
to 1000V, the requirements of VDE 0100 and its associated stan-
dards and specifications must be observed.
A main switch must be provided externally.
The supply circuit of the unit must be equipped with a fuse with the
correct rating (over current protection); the electrical details see
technical data.
Remove cover of the connection box.
Insert the mains cable (min. 3 x 1,5 mm
2
) through the cable gland and connect to the appropriate
terminals.
Insert the signal cable (low temperature alarm) through the cable gland and connect to the appro-
priate terminals (contact position T
u
shows alarm event).
Screw cover back in place.
Mains 230V 50Hz
or 115V 60Hz
Alarm outlet
1
2
1
2
+30
-30
800 W
Figure 10
Electrical connection for DIL-1/H..
W A R N I N G !
We recommend the use of temperature resistent cables!