Mechanical installation, Electrical connection, Illustration 2 – M&C TechGroup MP47-Z-BPR150 Operator's manual User Manual

Page 11: Dimensions (mm) mp47-z-bpr150, 1 mechanical installation, 2 electrical connection

Advertising
background image

11

Gas sampling and gas conditioning technology

6-1.1.7-ME

11.1

MECHANICAL INSTALLATION

For the mounting dimensions, see illustration 7.

Mount the pumps in such a way that the ventilator can suck sufficient cooling air.

Make sure that nobody can touch the ventilator. Mount the pumps at the highest point in the
system and/or mount them with the pump head downwards in order to avoid the collection of
condensate inside the pump head. This measure increases the service life.

Illustration 2 Dimensions (mm) MP47-Z-BPR150



11.2

ELECTRICAL CONNECTION

When executing electrical mounting works, please respect the appropriate safety instructions. Before
connecting the pump, take care that the electrical connection is voltage-free.

The diaphragm pumps MP47-Z-BPR150 must not be used in ha-
zardous locations.

W A R N I N G !



Wrong supply voltage can destroy the equipment.
When connecting the pump, please ensure that the supply voltage
is identical with the information provided on the type plate! A
deviation of max. +6 % or -10 % from the indication on the type
plate is allowed.






G1/4"

34

6

133

71

263

165

11

90

173

Advertising