M&C TechGroup SP180-H Operator's manual User Manual
Page 16

16
Gas sampling and gas conditioning technology
2.7a-ME
Loosen probe lid by turning handle
left and pull it out with o-rings
,
filter element sealings
,
filter element
with filter element holder
and filter’s knurled screw
;
Screw out the filter’s knurled screw
and renew filter element
;
Check filter element seals
and replace if necessary;
Check lid o-rings
and change if necessary;
Clean filter chamber; It is also possible to rod through the probe tube in order to remove
deposits.
Remounting happens in reverse order. To lock the lid put locking against the studs and turn
handle
right.
Figure 5
Replacing the filter element
17 SWITCHING
OFF
Before switching off, i.e. switching off the heating, the probe be flushed with inert gas or air in order to
avoid condensation of aggressive components from the process gas
.