4 level measurement – VEGA VEGABAR 82 Modbus and Levelmaster protocol - Operating Instructions User Manual

Page 20

Advertising
background image

20

4 Mounting

VEGABAR 82 • Modbus and Levelmaster protocol

46294-EN-131107

3

1

2

Fig. 14: Measurement setup for process pressure measurement of liquids in

pipelines
1 VEGABAR 82

2 Blocking valve

3 Pipeline

4.4 Level measurement

Keep the following in mind when setting up the measuring system:

•

Mount the instrument below the min. level

•

Do not mount the instrument close to the filling stream or emptying

area

•

Mount the instrument so that it is protected against pressure

shocks from the stirrer

Fig. 15: Measurement setup for level measurement

Measurement setup

Advertising