Torquetubes systems installation – Banks Power Chevy_GMC Trucks: Gas ’99 - 14 4.3,4.8,5.3,6.0,6.2,8.1 Exhaust- Torque Tubes System '99-08 GM 4.8L, 5.3L, 6.0L & '09-10 GM 5.3L Pickups & SUVs User Manual

Page 3

Advertising
background image

96410 v.4.0

3

1.

Raise the vehicle and support it

with properly weight rated safety

stands, ramps or a commercial hoist.

Follow the manufacturer’s safety

precautions. When using ramps, be

sure the front wheels are centered

squarely on the topsides; place the

transmission in neutral; set the parking

brake and place blocks behind the

rear wheels.
CAUTION: DO NOT WORK UNDER

ANY VEHICLE SUPPORTED ONLY

BY A FLOOR JACK. SEVERE INJURY

MAY RESULT.

2.

Disconnect the negative (ground)

cable from the battery (or batteries, if

there are two) before beginning work.

Secure the cable(s) so that they do not

come in contact with the battery posts

during the installation.

3.

Remove dipstick, unbolt and

remove dipstick tube. Pull dipstick

tube out with a twisting motion.
Note: to simplify removal of the stock

exhaust manifolds and installation of

Banks torque tubes, remove all plastic

retainer pins attached to the fender

lining on the front left and right wheel

liner, then remove the wheel liner and

set aside.

4.

Disconnect EGR tube from right

side exhaust manifold (if equipped).

Save all hardware for reinstallation.

See Figure 1.

TorqueTubes Systems Installation

Figure 1

Figure 2

Advertising