General installation practices – Banks Power Dodge Trucks: (Gas ’02 - 10 5.7L HEMI & 4.7L) Exhaust- Monster Exhaust '02-05 (03-05) Ram 1500 HEMI, (03-05) Ram 2500 HEMI, (02-03) Ram 1500 & 4.7L Magnum User Manual

Page 2

Advertising
background image

2

96443 v.7.0

Dear Customer,
If you have any questions

concerning the installation of

your Banks Monster Exhaust

System, please call our Technical

Service Hotline at (888) 839-2700

between 7:00 am and 5:00 pm

(PT). If you have any questions

relating to shipping or billing,

please contact our Customer

Service Department at

(888) 839-5600.
Thank you.

1.

Before starting work, familiarize

yourself with the installation procedure

by reading all of theinstructions.

2.

The exploded view (Figure 1)

provides only general guidance. Refer

to each step and section diagram in

this manual for proper instruction.

3.

Throughout this manual, the left

side of the vehicle refers to the

driver’s side, and the right side to

the passenger’s side.

4.

Disconnect the negative (ground)

cable from the battery (or batteries, if

there are two) before beginning work.

5.

Route and tie wires and

hoses a minimum of 6” away from

exhaust heat, moving parts and sharp

edges. Clearance of 8” or more is

recommended where possible.

6.

When raising the vehicle, support

it on properly weight-rated safety

stands, ramps or a commercial hoist.

Follow the manufacturer’s safety

precautions. Take care to balance the

vehicle to prevent it from slipping or

falling. When using ramps, be sure the

front wheels are centered squarely on

the topsides; put the transmission

in park; set the hand brake; and

place blocks behind the rear wheels.
Caution! Do not use floor jacks

to sup-port the vehicle while

working under it. Do not raise

the vehicle onto concrete blocks,

masonry or any other item not

intended specifically for this use.

7.

During installation, keep the work

area clean. Do not allow anything to

be dropped into intake, exhaust, or

lubrication system components while

performing the installation, as foreign

objects will cause immediate engine

damage upon start-up.

Tools Required:

1

2

” and

3

8

” drive ratchets with

standard and metric sockets and

1

2

” and

3

8

” drive extension

• Standard and metric combination

or open-end wrenches
• Standard screwdriver
• Clean shop towels or rags
• Pry-bar

Highly recommended tools and

supplies:
• Foot-pound torque wrench
• Penetrating oil or light

lubricant spray

General Installation Practices

Advertising