General installation practices – Banks Power Dodge Trucks: (Diesel ’94 - 98 5.9L Cummins) Forced Induction- BigHead Wastegate Actuator 1994-2004 Dodge ISB 5.9L Cummins User Manual

Page 4

Advertising
background image

Dear customer,

if you have any
questions concerning
the installation of
your Banks Big head
actuator, please call
our Technical service
hotline at (888) 839-
2700 between 7:00
am and 5:00 pm
(PT). if you have any
questions relating to
shipping or billing,
please contact our
customer service
Department at
(888) 839-5600.

Thank you.

1.

for ease of installation

of your Banks system,

familiarize yourself with the

procedure by reading the

entire manual before starting

work.

2.

Throughout this manual,

the left side of the vehicle

refers to the driver’s side,

and the right side to the

passenger’s side.

3.

Disconnect the ground

cable from the battery (or

batteries, if there are two)

before beginning work.

4.

Route and tie wires and

hoses a minimum of 6”

away from exhaust heat,

moving parts and sharp

edges. clearance of 8” or

more is recommended where

possible.

5.

when raising the vehicle,

support it on properly weight-

rated safety stands, ramps

or a commercial hoist.

Follow the manufacturer’s

safety precautions. Take

care to balance the vehicle

to prevent it from slipping or

falling. when using ramps,

be sure the front wheels are

centered squarely on the

topsides; put the transmission

in park; set the hand brake;

and place blocks behind the

rear wheels. Caution! Do not

use floor jacks to support

the vehicle while working

under it. Do not raise the

vehicle onto concrete blocks,

masonry or any other item

not intended specifically for

this use.

6.

During installation, keep

the work area clean. Do

not allow anything to be

dropped into intake, exhaust,

or lubrication system

components while performing

the installation, as foreign

objects will cause immediate

turbocharger and/or engine

damage upon start-up.

Tools required:

• 1⁄4” and 3⁄8” drive ratchets

with

standard

and metric sockets and

1⁄4” and 3⁄8” drive extension

• Standard and metric

combination

or open-

end wrenches

• Small standard screwdriver

• Standard or needlenose

pliers

• Clean shop towels or rags

highly recommended tools

and supplies:

• Compressed air source and

hose

• Air pressure regulator

• Inch-pound and foot-pound

torque wrenches

• Penetrating oil or light

lubricant spray

• Anti-seize compound

GenerAl InsTAllATIon PrACTICes

4 |

9 6 7 3 9 v . 2 . 0

Advertising