Monster exhaust system installation – Banks Power Ford Trucks: (Diesel ’08 - 10 6.4L Power Stroke) Exhaust- Monster Exhaust, Dual-Tip Passenger side exit '08-10 F-250_ F-350 User Manual

Page 5

Advertising
background image

96544 v.4.0

5

Monster Exhaust System Installation

1.

As a precaution, disconnect the

ground of the battery (if there is more

than one battery, disconnect both).

2.

Raise the vehicle and support it with

properly weight rated safety stands,

ramps or a commercial hoist. Follow

the manufacturer’s safety precautions.

Take care to balance the vehicle to

prevent it from slipping or falling. When

using ramps, be sure the front wheels

are centered squarely on the topsides;

place the transmission in park; set the

parking brake and place blocks behind

the rear wheels.
CAuTIoN: Do NoT WoRK uNDER

ANY VEHICLE SuPPoRTED oNLY

BY A JACK. SEVERE INJuRY MAY

RESuLT.
WARNING! The following step may

require the use of a torch and/

or saw. Proper safety equipment

should be used. Failure to use

proper safety equipment may

result in severe injury.

3.

Starting at the rear of the

vehicle, remove the tailpipe near the

intermediate pipe clamps by cutting

through the connection or by removing

the clamps and heating the joints

with an oxy-acetylene torch to allow

crimped pipes to separate. Remove

the tailpipe from the vehicle.

4.

Remove the clamps on the Diesel

Particulate Filter to intermediate pipe.

TAKE CAuTIoN NoT To CuT oR

DAMAGE THE DIESEL PARTICuLATE

FILTER TuBING DuRING THE

REMoVAL PRoCESS. Separate the

intermediate pipe to Diesel Particulate

Filter connection.

Note: the use of an oxy-acetylene

torch may be necessary. Remove

the intermediate pipe hanger pins

from the rubber hangers with a pry

bar (Spray lubricant will ease hanger

removal) and remove the intermediate

pipe assembly from the vehicle.

5.

Locate the supplied Banks

Intermediate pipe and cut the

Intermediate pipe based on the

following configurations. See Table

1. cut the NON-swedged end of the

intermediate pipe. See Figure 2.

6.

Install a 3

1

2

” exhaust clamp onto

the front of the Banks Intermediate

pipe. Install the Intermediate pipe onto

the Diesel Particulate Filter outlet.

Loosely snug the 3

1

2

” clamp.

7.

For Crew Cab Long Bed Models

Only, all other models skip to step 9.
Slide the supplied hanger clamp onto

the Intermediate pipe. Insert the

hanger pin into the factory rubber

hanger.

8.

Locate the supplied Extension pipe

for the crew cab Long Bed model. Install

supplied 4” exhaust clamp onto the inlet

of the Extension pipe. Install Extension

pipe onto the Intermediate pipe and

loosely snug the exhaust clamp.

9.

Install the rear hanger clamp onto

the intermediate pipe outlet with

the hanger pins facing the front of

the vehicle. Insert the two (2) hanger

pins into the rear rubber hangers and

adjust the hanger clamp to a position

that best supports the intermediate

pipe. (see Figure 3).

Advertising