Monster exhaust system installation – Banks Power Nissan Trucks: (Gas ’04 - 08 4.0L Frontier) Exhaust- Monster Exhaust, Single Passenger side exit '05-08 User Manual

Page 4

Advertising
background image

4

97057 v.3.0

1.

Disconnect the negative (ground)

cable from the battery (if there is more

than one battery, disconnect both

negative cables). Secure the cable so

it cannot accidentally come in contact

with the post.

2.

Raise the vehicle and support it

securely with properly weight-rated

safety stands, ramps or a commercial

hoist. Take care to balance the vehicle

to prevent it from slipping or falling.

When using ramps, be sure the wheels

are centered squarely on the topsides.

Place the transmission in park

(automatic) or reverse (manual), set

the parking brake and securely block

the wheels that are on the ground.
CAuTioN: Do NoT WoRK uNDER

ANY VEHiCLE SuPPoRTED oNLY

BY A FLooR JACK. SEVERE iNJuRY

MAY RESuLT.
WARNiNG! The following step

may require the use of a torch

and/or saw. Proper safety equip-

ment should be used. Failure to

use proper safety equipment may

result in severe injury.

3.

From under the vehicle remove the

factory exhaust starting at the rear of

the catalytic converter. Remove the

exhaust by removing the four (4) nuts

on the 2-bolt flanges connecting the y-

pipe to the catalytic converters. Retain

the factory nuts for reassembly.

4.

Support the exhaust at the tailpipe.

Remove the three (3) rubber hanger

supports from the body / frame by

removing the two (2) M8x1.25 bolts

on each rubber hanger. Retain all

hardware and rubber grommets for

reassembly.

5.

Remove the two (2) ground straps

on the factory exhaust system.

Remove the muffler and Y-pipe

assembly from the vehicle. Remove

the gaskets from the 2-bolt flanges.

6.

Remove the rubber vibration

dampener from the factory tailpipe.

7.

Install the factory rubber vibration

dampener onto the Banks tailpipe such

that the dampener is facing forward

(see Figure 2). Install using two

5

16

bolts, two

5

16

” nuts and four

5

16

washers. Do not tighten as a ground

strap will later be attached.

8.

Align the factory rubber hanger

onto the Banks hanger plate and

secure with the supplied

5

16

” bolts,

nuts and washers (see Figure 3).

9.

Align the hanger plate assembly

onto the original location of the hanger

such that the rubber hanger is on top

of the plate. Loosely reinstall the two

(2) factory bolts through hanger plate

into the vehicle frame.

10.

Attach the remaining two (2)

rubber hangers onto the original

vehicle body / frame locations. Use the

factory 8mm hardware to secure.

11.

Install the two (2) gaskets onto

the 2-bolt catalytic converter flanges.

Install the Y-pipe flange onto the right

side catalytic converter flange. Lightly

tighten the factory two (2) M8x1.25

nuts onto the factory studs.

12.

Install a 2-

1

2

” clamp onto the left

side headpipe. Install the left headpipe

slip fitting into the Y-pipe assembly.

Install the headpipe flange onto the

left side catalytic converter flange.

Reinstall the ground strap onto the

right factory stud and lightly tighten

the two (2) factory M8x1.25 nuts onto

the factory studs (see Figure 4).

13.

For Crew-Cab Long Bed models

only, install a 3” saddle clamp onto

the inlet of the supplied intermediate

pipe. Install the Intermediate pipe onto

the y-pipe outlet. Lightly tighten the 3”

clamp.

Monster Exhaust System installation

Advertising