Danze DC028110 - Installation Manual User Manual

Page 4

Advertising
background image



6

8. Remove the pedestal basin (A) from the ped-
estal column (B) and set both pieces aside while
installing the anchoring hardware.

9. Drill ¼” holes in the finished wall on the pencil
marks indicating the wall anchor hole location.
Install the wall anchor bolts (E) in the finished
wall leaving approximately 1½” of the wall an-
chor bolts (E) exposed.

10. Drill ³/

16

” hole in the floor on the pencil marks

indicating the pedestal column floor anchor hole
location.

11. Assemble the faucet and drain (not included)
in the pedestal basin (A) according to the manu-
facturer’s recommendations.

12. Move the pedestal column (B) back into po-
sition aligning the base with the pencil mark on
the floor.

13. Set the pedestal basin (A) into the proper
position on the pedestal column (B). Align the
holes in the back wall of the pedestal basin (A)
with the wall anchor bolts (E).

2. Place the pedestal column (B) close to the fin-
ished wall in the intended installation location.

3. Place the pedestal basin (A) onto the pedestal
column (B). Adjust the pedestal basin (A) posi-
tion so that it sits evenly on the pedestal column
(B).

4. Carefully slide the assembled pedestal lava-
tory up against the finished wall. Make sure the
back wall of the pedestal basin (A) is flush with
the finished wall.

5. Check the top of the pedestal basin (A) for
level front to back and side to side. Additional
cork pads (G) are provided to aid in leveling the
pedestal basin (A) if necessary.

6. Use a pencil to lightly mark the location of
the wall anchor holes in the back of the pedestal
basin (A) onto the finished wall.

7. Use a pencil to lightly mark the location of the
pedestal column base and the pedestal column
floor anchor hole onto the floor.

Advertising