EBM and EBM integrate a rack form


VI-3000R


Install the 3000VA series into 19” rack as shown below.

.






1. Turn on the UPS and connect the load.

2. After installing the UPS into rack, the load may be connected. Make

sure the load equipment is turned off, then plug all loads into the

output receptacle properly protected by a circuit breaker of fuse in
accordance with national and local electrical codes.