Peerless-AV LCZ-4F4G30B - Installation User Manual

Page 4

Advertising
background image

4 of 26

ISSUED: 04-05-11 SHEET #: 090-9201-4 (2013-10-03)

Base assembly can be attached to a mounting surface with a maximum thickness of 3-1/2" (90mm).

Set base (A) on mounting surface as shown in fi gure 1.1 and mark the center of the base. Drill a 3/8" (10mm) dia.

hole through mounting surface. OPTIONAL: Drill a 3/4" (19mm) dia. hole for cable management.

Remove base cover from base (A). Place base on mounting surface and secure using pressure clamp (B) as
shown in fi gure 1.2.

Hand tighten pole (D) onto base (A) as shown in fi gure 1.3. Tigthen set screw to secure pole using 3mm allen
wrench (L) as shown in rear view.

CABLE
MANAGEMENT
HOLE

1

Installation of Base

A

A

B

REAR VIEW

fi g 1.1

fi g 1.2

fi g 1.3

SET SCREW

D

Advertising