Ld g c, Ia j a g – Peerless-AV SC590 - Installation User Manual
Page 6
Advertising
6 of 12
ISSUED: 08-08-12 SHEET #: 009-9074-1
L
D
G
C
Attach uprights (G) to base (D), as shown below using six 3/8-16 x 2.5" socket screws (L) and M10 x .402ID lock
washers (C). Tighten all screws.
3
L
oosely attach six 1/4-20 x 12 mm screws (I) and
1/4-20 nuts (J) to mount bracket (A)
.
Repeat with second
mount bracket (A)
4
S
lid
e mount bracket (A) onto upright (G) so that 1/4-
20 nuts (J) slide into slots of upright (G) as shown in
fi gure 5.1 and detail 1. Slide display mount bracket
to desired position, level, then tighten
1/4-20 x 12 mm screws (I) using 4 mm allen wrench
(Q).
Repeat with second
mount bracket (A).
NOTE: Make sure that two mount brackets (A)
are level.
5
I
A
J
A
G
SLOT
fi g. 5.1
I
DETAIL 1
J
G
fi g. 3.1
Advertising