Bk n a – Peerless-AV PAG-UNV-HD - Installation User Manual
Page 6
Advertising
6 of 27
ISSUED: 08-13-09 SHEET #: 056-9023-7 09-10-12
Hand thread projector mount assembly (
A) into ceiling plate (B) as shown in figure 2.1. Align the notch of projector
mount assembly with one of the four holes in ceiling plate (
B) and secure with an M5 x 10 mm socket pin screw (K)
using allen wrench (
O) as shown in detail 1.
NOTE: Slotted set screw (N) is used to jam against the threads of the projector mount assembly to prevent any
excess movement of the projector mount assembly (
A). Do not overtighten screw; overtightening screw will damage
threads making it difficult to separate projector mount assembly from ceiling plate.
Flush Mount Installation
2
fig. 2.1
DETAIL 1
B
K
N
A
NOTCH
Advertising