6 load chain specifications (see figure 12 ), 7 removing the load chain – R&M Materials Handling ELECTRIC CHAIN HOISTS LoadMate Chain Hoist LM 16-20-25 User Manual

Page 30

Advertising
background image

LM16-20-25 I&M MANUAL/EN/11.30.2010


30/73

This document and the information contained herein, is the exclusive property of R&M Materials Handling, Inc., and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials Handling, Inc.
Copyright © (2010) R&M Materials Handling, Inc. All rights reserved.

6.6

Load Chain Specifications (see Figure 12)

Table 3. Load Chain Specifications

Hoist Type:

LM 16

LM 20/LM25

Chain Specification:

Load chain - 9.0 x 27.0

Load chain - 11.3 x 31.0

Chain type:

Standard

Standard

Diameter (ød) x pitch (t):

0.3543 x 1.0629 in [9.0 x 27.0
mm]

0.4449 x 1.2205 in [11.3 x 31.0
mm]

Length over 11 links (11t):

11.6929” [297 mm]

13.4251” [341 mm]

Class:

DAT

DAT

Grade:

H8S or HE G80 RAS

H8S or HE G80 RAS

Maximum working stress:

123.4 N/mm

2

122.3 N/mm

2

Hardened surface:

580 or 700 HV

580 or 700 HV

Thickness:

0.18 to 0.45 mm

0.21 to 0.52 mm

Standard:

DIN 5684 – 8

DIN 5684 - 8

Marking (10 x t):

1 or 16

1 or 16

H 8 S or A 8

H 8 S or A 8

Maximum working load, 1
fall:

3527 lbs. [1600 kg]

3 STONS/6000 lbs. [2722 kg]

Breaking load:

93 Kn

160 kN

Maximum breaking stress:

116,030 lbs/in

2

(800 N/mm

2

)

116,030 lbs/in

2

(800 N/mm

2

)

Total breaking elongation:

>10% min.

>10% min.

Weight for 100 links:

1.8 kg

2.85 kg

6.7

Removing the Load Chain

1-FALL CHAIN

1. Remove load from hook block assembly.
2. Remove load block assembly from load chain. Some disassembly of 1-fall load block is required.
3. Attach the chain insert tool to the end of bottom block end of the chain.
4. Run hoist in “

UP” direction until all of chain is in container. Stop the hoist with the insertion tool

remaining in the hoist ready for the new chain.

5. Remove chain container with all of old chain in chain container.
6. Remove fall stop from old chain and save for use with new chain.

2-FALL CHAIN

1. Remove load from hook block assembly.
2. Run hoist in “

UP” direction until hook block assembly is about 1.0 foot [30cm] from hoist body.

3. Unfasten load chain from chain anchor mounted on hoist body.
4. Remove load block assembly from load chain by allowing chain to run through it. Attach the chain

insertion tool to the bottom block end of the chain.

5. Run hoist in “

UP” direction until all of the chain is in the container. Stop the hoist with the insertion tool

remaining in the hoist ready for the new chain.

6. Remove chain container with old chain.
7. Remove fall stop from old chain and save for use with new chain.