Installation procedure – Swanstone BT-3060L_R - Installation User Manual

Page 10

Advertising
background image

Example 2

If the bathtub is to be installed in conjunction with a
Swan Corporation BA Series Alcove Wall Kit, the
following procedures must be followed.

1.

After bathtub installation is complete, refer to the
alcove wall kit manual for more information on
installing alcove wall kits.

2.

Follow those instructions to install any required filler
boards and the Swan Corporation Alcove Wall Kit,
directly to the stud wall framework.

Example 3

If the bathtub is to be installed in conjunction with
existing moisture-resistant wall board, the following
procedures must be followed.

1.

After the bathtub installation is complete, install
1/2” moisture-resistant wall board over the existing
wall surface, as shown.

2.

The Swanstone or alternate shower wall material will
be installed over the new layer of 1/2”
moisture-resistant wall board and the bathtub flange,
as shown.

To prevent possible water (wicking affect) damage to the
wall, the second layer of wall board must have a 1/2
inch gap above the bathtub flange lip, as shown below.

BT-005

SWANSTONE

TUB WALL PANEL

OR ALTERNATE

TUB WALL PANEL

MOISTURE
RESISTANT
DRYWALL (1/2”)

EXISTING WALL

2 x 4 STUD

BATHTUB
FLANGE

IMPORTANT NOTICE

ABS-018c

Side
Panel

Multiple Studs

Bathtub
Ledge

A

B

Top View
Looking Down

3/4” Filler Board for
Shower Door Installation

The Swan Corporation – Swanstone

10

800-325-7008

Installation Procedure