Installation procedure – Swanstone STS-3738 - Installation User Manual

Page 17

Advertising
background image

Floor Drain Installation

If no-hub, cast-iron drain pipe is used, make sure the
end of the pipe is free of nicks, cuts, or burrs. To ensure
a proper seal, lightly sand the outside of the drain pipe
with emery paper or “0000” steel wool.

1.

Lubricate both caulk seal gasket (1) and drain pipe
(2) with either liquid hand soap or dishwashing
liquid, and slide the caulk seal gasket over the drain
pipe.

2.

Complete the installation by snapping strainer plates
(3) into place. With metal strainers, it may be
necessary to bend the strainer tines slightly outward.

Note: If you need to pry the strainer up from the drain,
you have a proper fit.

3.

Place cardboard, or similar scratch resistant
material, in the bottom of the shower floor to prevent
possible damage during further construction.

The shower floor/floor installation is now
complete. DO NOT discard these installation
instructions. PLEASE LEAVE THEM WITH THE
HOMEOWNER.

BK-SB-005

IMPORTANT NOTICE

Installation Procedure

800-325-7008

17

The Swan Corporation – Swanstone

Advertising