Enclosed trailer installation instructions, Bill of materials – Buyers LT30 User Manual

Page 2

Advertising
background image

Quality since 1946

9049 Tyler Blvd. • Mentor, Ohio 44060

Phone (440) 974-8888 • Fax (440) 974-0165

Toll-Free Fax 800-841-8003 • buyersproducts.com

3004397 Rev. B

Warranty Information

Buyers Products warrants all truck/trailer hardware

manufactured or distributed by it, to be free from

defects in material and workmanship for a period of

one year from date of shipment. Parts must be pro-

perly installed and used under normal conditions.

Any product which has been altered, including modi-

fication, misuse, accident or lack of maintenance will

not be considered under warranty. Normal wear is

excluded. The sole responsibility of Buyers Products

under this warranty is limited to repairing or replac-

ing any part or parts which are returned, prepaid, and

are found to be defective by Buyers Products.

Authorization from Buyers Products must be obtained

before returning any part. No charges for transporta-

tion or labor performed on Buyers’ products will be

allowed under this warranty.

Enclosed Trailer Installation Instructions

Tools and Materials Required:
•9/16" Wrench or Socket
•7/32" Hexagon Allen Wrench
•Electric Drill
•1/4" Drill Bit
•3/4" Plywood Shim Strips
•Shim Screws

1. Assemble the gusset bracket to the gas can rack with

two 3/8-16 x 1-1/4 socket head cap screws, four 3/8" flat
washers and two 3/8-16 nylock nuts supplied.

2. In order to mount this rack to an enclosed trailer, you

must first add 3/4" plywood shim strips to the walls.
These shim strips must be attached to at least two wall
support studs with suitable fasteners. If you don’t know
what kind or length of fastener to use contact your trailer
dealer or manufacturer for their recommendation.

3. Place the place the gas can rack with gusset against

the shims, hold level, and mark the position of the two
3/8" holes in rack and the two 3/8" gusset holes.

WARNING! Check for locations of brake lines and

electrical wiring etc., before drilling any holes. Any

damage to trailer during installation is the installer’s

sole responsibility.

4. Drill four 1/4" pilot holes in the positions just marked
for the 3/8" lag screws.

Be extremely careful not to drill

through the outside trailer wall.

1 3004328 1

Rack, Gas Can, Rack Only

2 3004501 1

Bracket, Gusset, LT15 & LT30

3 3004710 1

Strap, 60" Lashing w/Cam Buckle

4

-

8

Washer, Flat 3/8 USS Zn

5

-

2

Screw, Button Socket Head Cap, 3/8-16 x 1-1/4

6

-

2

Nut, Nylock 3/8-16 x 7/16 Zn

7

-

4

Screw, Hex Head Lag, 3/8 x 1-1/4, Zn

ITEM PART NO.

QTY. DESCRIPTION

Bill of Materials

5. Fasten the rack to the trailer wall with the four 3/8"

x 1-1/4" lag screws and four 3/8" flat washers supplied.

6. Thread the free end of the strap through the rack as

shown for holding two 2-1/2 gal. cans or thread the strap
into the other slots for holding one 5 gal. can. Then thread
the buckle onto the end of the strap as shown.

Advertising