5 inspection of contacts’ tilt and gap, Pay attention to the warnings, section 1, A) remove the arc chute and adapter – GE Industrial Solutions GERAPID 2607, 4207, 6007, 8007 with arc chutes 1X2, 1X4, 2X2, 2X3, 2X4 User Manual

Page 41: B) check the tilt of the main contacts, C) check the air gap of arcing contact, D) install back adapter and arc chute, 6 inspection of the screw connections, 7 inspection of the mechanical components, Fig. 45 closing operation by using hand lever, Fig. 46 inspection of the main contacts’ tilt

Advertising
5 inspection of contacts’ tilt and gap, Pay attention to the warnings, section 1, A) remove the arc chute and adapter | B) check the tilt of the main contacts, C) check the air gap of arcing contact, D) install back adapter and arc chute, 6 inspection of the screw connections, 7 inspection of the mechanical components, Fig. 45 closing operation by using hand lever, Fig. 46 inspection of the main contacts’ tilt | GE Industrial Solutions GERAPID 2607, 4207, 6007, 8007 with arc chutes 1X2, 1X4, 2X2, 2X3, 2X4 User Manual | Page 41 / 60 5 inspection of contacts’ tilt and gap, Pay attention to the warnings, section 1, A) remove the arc chute and adapter | B) check the tilt of the main contacts, C) check the air gap of arcing contact, D) install back adapter and arc chute, 6 inspection of the screw connections, 7 inspection of the mechanical components, Fig. 45 closing operation by using hand lever, Fig. 46 inspection of the main contacts’ tilt | GE Industrial Solutions GERAPID 2607, 4207, 6007, 8007 with arc chutes 1X2, 1X4, 2X2, 2X3, 2X4 User Manual | Page 41 / 60
Advertising