1 preparing the system for rack mounting, 2 attaching the inner rail to the server, Preparing the system for rack mounting -2 – Asus TS500-E5/RX8 User Manual
Page 52: Attaching the inner rail to the server -2, Removing the top cover, Removing the footpads
Advertising
This manual is related to the following products: