Setting up the system

Pre-installation requirements

Selecting a site

Before unpacking and installing the system, select a suitable site for
the system for maximum efficiency. Consider the following factors
when choosing a site for the system:

•

Near a grounded power outlet

•

Clean and dust-free

•

Stable surface free from vibration

•

Well-ventilated and away from sources of heat

•

Secluded from electromagnetic fields produced by electrical
devices such as air conditioners, radio and TV transmitters, etc.

Checking the package contents

Check the following items from the package:

•

Acer Altos R5250 server system

•

Acer EasyBUILD

TM

•

Acer Altos R5250 accessory box

If any of the above items are damaged or missing, contact your dealer
immediately.

Save the boxes and packing materials for future use.