Bell & Gossett HS 600D Pilot Mounting Hardware Kits Series 2000 Pressure and/or Temperature Steam Regulators User Manual

Page 3

Advertising
background image

3

Pilot Installation Detail - For Reference Only

STEP 2 - Mounting Pilot Hardware

A

D

10 Pipe

Diameters

C

B

Applies to All Pilots
Numbers in parentheses refer to items in Kits A or B, pg. 1.
1.

The pilot valve(s) can be installed on either side of the
main valve. The main valve is shipped with the U-
tubing and the bleed orifice installed for left-hand side
mounting of the pilot valve(s). If right-hand side
mounting of the pilot(s) is desired, the U-tubing and
the bleed orifice must be relocated to the opposite
sides of the main valve.
Note: Right-hand side and left-hand side positioning is
determined when the main valve inlet directly faces
the observer.

2.

Make sure the bleed orifice is installed in the 1/8 NPT
tapping on the outlet end of the main valve on the
opposite side from the U-tubing. Remove the 1/8 NPT
pipe plug from the bleed orifice and replace it with a
1/8 NPT x 1/4" (6mm) OD tubing, straight compression
fitting (from the hardware kit #10).

3.

Install the 1/4 NPT x 1-1/2" (38mm) nipple and half of
the union connection (from the hardware kit #4 and
#5) on the inlet end of the main valve.

4.

Use the 1/4 NPT x 4" (101mm) nipple (#3) and the
remaining half of the union connection (from the hard-
ware kit) to mount the first pilot. Mount additional
pilots as required using 1/4" steel pipe nipples.

5.

Install the copper tee fitting (from the hardware kit #6)
in the 1/8 NPT signal tapping on the side of the
last pilot with the tee pointing down.

6.

Install the L-fitting (from the hardware kit #7) in the tapping
at the center of the main valve diaphragm cover.
Note: For steps 7 and 8, trim the length of the copper
tubing as required (see "Tubing Length Chart", page
2) to make a neat installation. Be sure to ream the
tube to the full tube diameter after cutting.

7.

Install the S- or J-copper tubing (from the hardware
kit #2 or #9) from the tee fitting to the bleed orifice.

8.

Install the L- copper tubing (from the hardware kit #1)
from the bottom of the tee fitting to the L-fitting in the
main valve diaphragm cover.

9.

The 1/4" feedback tapping must be connected to the
downstream piping for either a spring or air pressure
pilot:
• Use 1/4 black steel pipe for the feedback line (B)

(not supplied with this kit).

• Install a 1/4 NPT shut off valve (D) and union (C)

in this line to allow service of the pilot while
operating the system on the by-pass line.

• The feedback line must pitch away from the pilot

to avoid erratic operation, excessive fouling and
eliminate water pockets.

When the regulator is used with a heat exchanger,
connect the feedback line (B) to the heat exchanger
shell. A tee fitting can be installed in the heat
exchanger for a vacuum breaker connection.

1/4 NPT
Feedback
Port

1/4 NPT Inlet
on opposite side

1/8 NPT
Signal Port
(#6 Tee Goes
Here)

Identification of SPS Series Spring Pressure Pilot Ports

Identification of Air and Temperature Pilot Ports

Air Pilots

Temperature Pilot

Feedback

Signal

Inlet

Signal

Feedback

Inlet

Signal

Inlet

Advertising