Xylem IM197 R01 ADDENDUM Revision to Impeller Assembly Process NPE – IM013 MCC – IM060 MCS – IM052 User Manual

Addendum

Advertising
background image

Subject:

Revision to Impeller Assembly Process

Effective August, 2006
To Be Used With Model and IOM Form Number:

NPE – IM013

MCC – IM060

MCS – IM052

ADDENDUM

Installation, Operation and Maintenance Instructions

DISASSEMBLY: To remove impeller, apply localized heat to the impeller hub to a tem-

perature between 150oC - 250oC if needed. Heat Impeller hub for 1-3 minutes. This
will decrease the breakloose strength of the Loctite 243 and allow for easy removal.

ASSEMBLY: To install impeller clean shaft thoroughly with denatured alcohol let dry.

Apply Loctite 7649 primer to shaft, impeller threads and allow 3-5 minutes to dry. Ap-
ply 3 drops of Loctite 243 medium strength threadlocker to shaft threads and 2 drops

to the impeller threads. Tighten impeller to 144 lb-in or 12 lb-ft. No Jam nut needed.

Allow impeller to cure for 30 minutes before testing or running.

INSTRUCTION MANUAL

IM197

Advertising