Xylem IM216 R2 S-Drive Quick Start Up Guide User Manual

Spd quick start up guide, Start-up guide

Advertising
background image

3

FLOW

4

6

5

1

2

8

9

7

1 SPD_F CONTROLLER
2 FUSIBLE DISCONNECT
3 PRESSURE GAUGE
4 AIR DIAPHRAGM TANK
5 PRESSURE TRANSDUCER
6 3 PHASE OUTPUT (ALWAYS)
7 DISCHARGE CHECK VALVE
8 GATE VALVE (HIGHLY RECOMMENDED)
9 SUBMERSIBLE PUMP END

10 SUBMERSIBLE MOTOR (3 PHASE)
11 PRESSURE RELIEF VALVE
NOTE: FOR SINGLE PHASE INPUT, CONNECT L1 AND L3, THEN SET MOTOR
OVERLOAD SWITCHES TO 50% OF CONTROLLER RATING OR LOWER.

L1
L2
L3

GND

T1
T2
T3

GND

10

11

SUPPLY POWER

START-UP GUIDE

IM216R02

SPD Quick Start Up Guide

Step 1: Mount drive on secure wall or support beam using 4 screws. Ensure drive is well ventilated. Leave at least 8" of free space

around the controller for cooling. Plug conduit holes not used.

Step 2: Measure site voltage phase to phase and phase to ground; verify if the incoming voltage is single or three phase 230 or

460 volt supply. Models SPD2XXXXF require 230V input voltage. Models SPD4XXXXF require 460V input voltage.

Step 3: Provide a dedicated fused disconnect (item #2 above) or circuit breaker rated for drives input amps. No other equipment

should be used for this disconnect. Use fast acting class T fuses.

Step 4: Connect wire from input power supply to L1, L2, L3 and GND. NOTE: For single phase supply power, wire to L1 and L3 and

adjust overload switches for 50% of drive current rating. Ensure you have a solid ground from the building or site. Ensure
the ground is continuous between the service entrance and the controller. Ensure there is at least 8" between the input
wires and any other wires.

Step 5: Ensure you have a three phase motor. Connect motor leads to T1/U, T2/V, T3/W and GND. Ensure the ground is continu-

ous between the controller and
the motor. For CentriPro mo-
tors, connecting T1/U to Red,
T2/V to Black and T3/W to Yel-
low will give the correct rota-
tion. To change rotation, swap
any two motor leads T1/U, T2/V
or T3/W. Ensure there is at least
8" between the output wires
and any other wires.

Step 6: Plumb pressure transducer in

straight piece of pipe down-
stream of last check valve in
system. Do not install the pres-
sure transducer or pressure
tank where freezing can occur.
If pressure transducer is placed
in grounded metal piping,
disconnect the drain wire in the
pressure transducer cable from
the controller chassis.

Step 7: Pre-charge bladder tank to 20

psi below your system pres-
sure. Tank capacity should be
at least 20% volume of max
pump GPM.

Step 8: Set the Motor Overload Setting

Switches. Choose a setting that
is equal to or less than the mo-
tor’s SFA rating.

Step 9: Factory pressure setting is

50psi when used with a 300psi
transducer. Press and hold INC or DEC button to adjust pressure while pump is running. Ensure drive goes into stand-by
mode (solid green light/pump off) to save pressure setting.

NOTE: Do not connect power to CONTROL TERMINALS. Connect only non-powered switch contacts to these

terminals.

Advertising