Maintenance, Schedule, Installation complete – Xylem MM 305G Valve, Cartridge and Strainer Replacement Kit SA-47-101-102, SA51-101-102 User Manual
Page 4
Xylem Inc.
8200 N. Austin Avenue
Morton Grove, Illinois 60053
Phone: (847) 966-3700
Fax: (847) 965-8379
www.xyleminc.com/brands/mcdonnellmiller
McDonnell & Miller is a trademark of Xylem Inc. or one of its subsidiaries.
© 2012 Xylem Inc. MM-305G April 2012 Part No. 246739
MAINTENANCE
SCHEDULE:
• Disassemble and inspect the strainer annually.
Thoroughly clean the strainer screen or replace.
• Remove and inspect cartridge annually.
Thoroughly clean by rinsing with clear water
or replace.
A
CITY WATER
SUPPLY
WATER
SUPPLY VALVE
IN
OUT
VALVE
BY-PASS
C
B
CONNECT TO RETURN HEADER
ON BOILER SIDE OF ALL VALVES
BY-PASS VALVE
(EXAMINE VALVE TO MAKE SURE
IT IS CLOSED TIGHTLY)
2. Reinstall the inlet and outlet piping to
the water feeder valve (C).
NOTE:
Model 47-C inlet and outlet are
reversed. Open supply valve (A).
Open supply valve (B). Following the
installation instructions that came with
the water feeder, check for proper
operation. Make sure there are no
leaks.
INSTALLATION COMPLETE