a. Using the criteria in Step 1,

determine the location of the
51/51-2, 51-S/51-S-2 or 53/53-2.
This applies when the gauge
glass is directly mounted in the
boiler or on a water column.

b. Use Figure 1 or Figure 2 as a

general guide.

c. Connect steam equalizing lines

to any available opening other
than steam flow line.
(Take off line).

d. Test the Model 51/51-2, 51-S/51-S-2 and 53/53-2 Before Turning it Over to the Owner

Open the blow-down valve while burner is operating. As the water level drops the feeder will begin to
add water. As the water continues to drop the burner will shut off (on the 51-2, 51-S-2 and 53-2 only).

STEP 2 - Installation of the Models 51/51-2, 51-S/51-S-2 and 53/53-2

3

Lower
Gauge
Glass

Connect to Return
Header on Boiler
Side of all Valves

1" Crosses

Gauge Glass

Level

Mark

1" Steam Equalizing Line

(Short as Possible)

1" Minimum Blow-down
Valve for Feeder
Float Chamber

1" Water
Equalizing Line
(Short as Possible)

Cold City Supply

Normal Water Line

Swing Check Valve

By-Pass

Feeder Casting Mark
(See Installation Location)

1" Crosses

Level

Mark

Water

Column

1" Steam Equalizing Line (Short as Possible)

1" Minimum Blow-down Valve

for Feeder Float Chamber

Normal Water Line

Feeder Casting Mark
(See Installation Location)

Connect to Return
Header on Boiler
Side of all Valves

Swing Check Valve

Cold City Supply

By-Pass

1" Water Equalizing Line (Short as Possible)

1" Minimum Blow-down Valve

Figure 1