Gorman-Rupp Pumps 86A2-F4L 1322538 and up User Manual
Page 12
Advertising
80 SERIES
OM-00957
PAGE B - 5
INSTALLATION
process. This may be accomplished by installing a
bypass line from the top of the pump, back to the
source of liquid. The end of the bypass line must be
submerged. The line must be large enough to pre
vent clogging, but not so large as to affect pump
discharge capacity.
ALIGNMENT
The alignment of the pump and engine are critical
for trouble‐free performance. See Section E, Se
curing Intermediate And Drive Assembly To En
gine in MAINTENANCE AND REPAIR, for details.
Advertising