Gorman-Rupp Pumps 810A2-F6L All serial numbers User Manual

Page 12

Advertising
background image

80 SERIES

OM−02754

PAGE B − 5

INSTALLATION

process. This may be accomplished by installing a
bypass line from the top of the pump, back to the
source of liquid. The end of the bypass line must be
submerged. The line must be large enough to pre-
vent clogging, but not so large as to affect pump
discharge capacity.

ALIGNMENT

The alignment of the pump and the engine is criti-
cal for trouble-free mechanical operation. See Sec-
tion E, Securing Intermediate And Drive Assem-
bly To Engine for detailed information.

Advertising