Installation - section b – Gorman-Rupp Pumps 3D-E1.5 1P 883504 and up User Manual

Page 8

Advertising
background image

D SERIES

OM-03604

PAGE B - 1

INSTALLATION

INSTALLATION - SECTION B

Review all SAFETY information in Section A.

Since pump installations are seldom identical, this

section offers only general recommendations and

practices required to inspect, position, and ar­

range the pump and piping.

For further assistance, contact your Gorman‐Rupp
distributor or the Gorman‐Rupp Company.

Pump Dimensions

See Figure 1 for the approximate physical dimen­
sions of this pump.

OUTLINE DRAWING

Figure 1. Pump Model 3D‐E/X1.5 All Voltages

PREINSTALLATION INSPECTION

The pump assembly was inspected and tested be­
fore shipment from the factory. Before installation,
inspect the pump for damage which may have oc­
curred during shipment. Check as follows:

a. Inspect the pump for cracks, dents, damaged

threads, and other obvious damage.

b. Check for and tighten loose attaching hard­

ware. Since gaskets tend to shrink after dry­
ing, check for loose hardware at mating sur­
faces.

c. Carefully read all tags, decals, and markings

on the pump assembly, and perform all duties
indicated.

d. Check levels and lubricate as necessary. Re­

fer to LUBRICATION in the MAINTENANCE
AND REPAIR
section of this manual and per­
form duties as instructed.

e. If the pump and

motor have been stored for

more than 12 months, some of the compo­
nents or lubricants may have exceeded their
maximum shelf life. These must be inspected

Advertising
This manual is related to the following products: