Alera Lighting BENE User Manual
Page 2
 
t
echnical
i
nStallation
D
ata
B`
ene
, D
irect
/i
nDirect
F
ix
tu
re
c
o
nn
ec
ti
o
nS
S
uS
pe
nS
io
n
a
tt
ac
hm
en
t
Connection Instructions:
1.	 Install	first	fixture	of	row	with	two	hangers.
2. Place bolts through openings in internal end cap.
3.	 Slide	diecast	coupler	over	end	of	fixture	with	bolts.		
Screw bolts through threaded holes in coupler to
 retain coupler.
4.	 Slide	other	fixture	onto	bolts	and	attach	nuts.
5. Repeat steps 2, 3 and 4 until row is complete.
6. At the end of the row attach diecast end caps with 
appropriate nuts.
Diecast Coupler
Plunger
Cable
Gripper
Yoke
Nut
SCREW 10-32 X
1
⁄
2
″
PART #136710
NUT 10-32
PART #112392
AL 05/07
701 Millennium Blvd
Greenville SC 29607 • (864) 678-1000
www.aleralighting.com
We are architectural fluorescent lighting
Subject to change without notice.
Suspension Instructions:
1.	 Set	bottom	nut	to	desired	fixture	height.
2. Slide cable hanger into hanger slot.
3. Secure and tighten upper nut.
4. Push plunger down to adjust cable to 
	 proper	suspension.	Cut	excess	cable.
5.	 For	fine-tuning	of	fixture	balance,	slide		
knuckle across yoke. Twist cable
gripper to lock in place.
Shown with optional end cap.