Bfb624e, Load test, Installation instructions – BeStar BFB624E User Manual
Page 4
T
h
is
p
ri
n
t
a
n
d
i
n
fo
rm
a
tio
n
t
he
re
i
n
a
re
p
ro
p
ri
e
ta
ry
t
o
B
e
s
ta
r
E
le
c
tr
o
n
ics
I
ndu
s
tr
y
C
o
.,
L
td.
a
nd
s
h
a
ll
no
t
b
e
u
s
ed
i
n
w
h
o
le
o
r
in
pa
rt
w
ith
ou
t
it
s
w
ri
tt
en
c
on
tent
C
B
A
Note
Approved by:
Drawn
Rev.
Date
2
BS/TEA01.090A
6
5
4
3
Page:3 of 3
1
李毕佳
06.04.18
Drawn by:
Checked by:
Date:
A
B
C
H
G
F
E
D
E
D
F
2
5
6
3
4
G
1
H
BFB624E
Bell
李毕佳
06.04.18
A
BFB624E
10. Load test
Voltage 24VDC
Duration 48hours
1) To install bell, first remove the gong using the hex key provided.
2) Use elther of the two sets of mounting holes to allow installation
to 50mm& 60mm pitch mounting boxes.
3a) When mounting on to mounting box use the wiring access slot.
3b) When wall mounting wire in from the top ensuring wiring will not foul the gong.
4) During installation,always ensure that the terminal block is at the top.
5) Refit the gong, always aligning mounting lugs and fasten tightly with the screw provided.
9. Installation Instructions:
Top
+
+
-
+ve
OUT
+ve
IN
-ve
IN
-
-ve
OUT
Wiring Diagram
50
Wiring Access
60
程久生
郭敏