Installation procedures – Dings Magnetic Group Self-Cleaning Permanent Overhead Magnet User Manual

Page 4

Advertising
background image

Revised May 19, 2014

Installation Procedures

Unpacking and Handling


Upon receiving, check all packaged material for shortage of parts and possible damage.
Report shortages and damage to the carrier who delivered shipment. The magnet was
shipped fully assembled, ready for operation. If a material deflector was supplied, it was
shipped separately and must be bolted on before operation.

Magnet


This Dings self-cleaning permanent magnet was shipped using 4” x 6”

wooden

beams as

supports under the two sides of the magnet. This is done to protect the belt and the
magnet surface from damage during shipment. After unloading, the magnet should never
be placed directly on the ground. Rather, wood beams or some other means of support
should be placed beneath the two sides of the magnet box to raise the magnet and belt
above the ground.

The magnet should always be moved using the four lifting lugs provided. Never use a
forklift or other device to lift the magnet from the bottom.

The magnet should be stored indoors prior to installation.
























2

Advertising