Model tp-3 service – PA Industries Transporter User Manual

Page 6

Advertising
background image

6

1. Remove both Snap Rings and push the Front and

Rear Pistons inside Body.

2. Remove the Screws from the Rear Guide Holder

T3-204. Pull out together with Speed Adjustment
Knob T3-401.

3. Remove the Front Guide Holder T3-203.

4. Remove both Guide Holders (L & R) T3-201 and the

twelve (12) Ball Bearings.

5. Back out the Locking Screw T3-406 and remove the

Speed Adjustment Valve T3-603.

6. With both T3-701 Tools provided in the kit, remove the

Valve Discs and the Rod.

7. Check all “O” Rings, Springs, Discs, and Seals for
damage and replace as needed.

Factory Repair & Rebuild Service

Return the Transporter by UPS Prepaid to our repair center.
After teardown and inspection, P/A Industries will notify you
of the recommended cost for spare parts and labor.

1. Install the Speed Adjustment Valve T3-603 and align

with the groove for the Locking Screw T3-406.

2. Insert the Front Piston T3-302 into the Body with the

Bumper Ring.

3. Mount the Bumper Ring and insert the Rear Piston

T3-303 into the Body.

4. Grease both Guide Holders T3-201 and put twelve (12)

Ball Bearings into both Bearing Plates T3-210. Hold
the Bearing Plates by hand while attaching Front and
Rear Holders. The Guide Holder assembly must run
smoothly in both directions without side-to-side
play.

5. Pull both Pistons T3-302 and T3-303 back into position

and secure the Snap Rings.

MODEL TP-3 SERVICE

Disassembly

Reassembly

Advertising