Schreiber Chillers 15 Med Main Manual User Manual

Schreiber engineering start up service

Advertising
background image

SCHREIBER ENGINEERING START UP SERVICE

THE FOLLOWING ITEMS MUST BE COMPLETED PRIOR TO START UP SERVICE

BE SURE YOU UNDERSTAND THOROUGH THE CONTENT CONTAIN IN THIS

MANUAL; SHOULD YOU HAVE ANY QUESTION REGARD THIS MANUAL FOR

INSTALLATION PLEASE CONTACT SCHREIBER ENGINEERING.

9 Appropriate piping has been completed between the chiller and the medical

equipment.

9 Correct electrical power has been connected to the chiller.

9 Reservoir and all lines must be full of the proper water / glycol mix.

PLEASE CALL SCHREIBER NO LESS THAN 72 HOURS PRIOR TO THE DATE YOU

WANT START UP SERVICE TO BE PERFORMED ON YOUR EQUIPMENT.

NOTIFY SCHREIBER 24 HOURS PRIOR TO THE SCHEDULE IF FOR ANY REASON

YOU WILL NOT HAVE THE PIPING COMPLETED – ELECTRICAL POWER

CONNECTED – OR WATER GLYCOL MIXTURE HAS NOT BEEN ADDED TO THE

PIPING OR UNIT.

SCHREIBER WILL CONFIRM THE TIME AND DATE OF THE START UP AND WHO

WILL PERFORM THE START UP SERVICE WITH THEIR LOCAL PHONE NUMBER.

WHEN THE START UP SERVICE ARRIVES AND THEY FIND ANY OF THE ABOVE

THREE ITEMS NOT COMPLETED PHILIPS WILL BE BILLED FOR THEIR TIME TO

RETURN TO THE JOBSITE.

CALL SCHREIBER IF SECURING THE PROPER GLYCOL FOR THE CHILLER IS A

PROBLEM FOR THE FACILITY. WE CAN SHIP THE PROPER GLYCOL FROM LOS

ANGELES OR CLEVELAND AT A COST OF $70.00 PER 5-GALLON CONTAINER.

TOLL FREE TELEPHONE NUMBER: 888-251-8522

24-HOUR SERVICE: 562-228-9719

E MAIL GEORGE WOODS:

[email protected]

Advertising