J&M 275ST User Manual

Page 17

Advertising
background image

14

1.0 Operations

2.1 Grease Conveyer/Auger Bearings

Grease the conveyor/auger bearings every 10 hours of operation and before storage. Use only two pumps of

grease per bearing (Figure 2.1).

NOTE: Over lubrication of these bearings will result in premature failure.

NOTE: The conveyor has four bearings that need grease (two at each end). The auger is equipped with

one bearing (at hopper end).

2.2 Grease Boom Arm

Grease pivot points on boom arm every 50 hours and before storage (Figure 2.2).

2.0 Service

Figure 2.1

Grease Point

Grease Points

Figure 2.2

Advertising