Tools required for installation parts – CHIEF PAC511 User Manual

Page 4

Advertising
background image

PAC511

Installation Instructions

4

TOOLS REQUIRED FOR INSTALLATION

PARTS

3/16"

M4
(included)

1/8-18 x 3/4"

E (8)

F (4)
M7 x 40mm

C (6)
[Wire Tie Clip]

B (4)
1/4"

A (1)

PAC-511

H (2)

10-32 x 3/8"

J (2)

#10

1

2

Grounding screw and washer installed at factory
(See Figure 4 on page 6.)

Earthing symbol IEC 60418 No. 5019
affixed adjacent to grounding terminal.

D (1)
M4

G (4)
1/4" x 2"

Advertising